-
Description
Description
Lochinvar 100233299 LP GAS CONTROL
The versatile These Lochinvar products are extremely versatile in their application, and come with a 1 year warranty. Relying upon a global service network for support and training, please follow the below guidelines before attempting to remove or install boiler parts
• Service and maintenance schedules
• Inspect boiler area and boiler interior
• Clean condensate trap
• Check all piping for leaks
• Check air openings
• Flue vent system and air piping
• Check water system, expansion tank, and boiler relief valve
• Inspect ignition electrode and ground wiring
• Check all boiler wiring and control settings
• Perform start-up operation
• Check burner flame and flame signal, and flue gas temperature
• General maintenance, such as cleaning boiler heat exchangerWe ship many products from stock.
Please Contact Sigma Parts for your next price requisition on Lochinvar or any industrial control.